Skip to content
MTR 1 completed house in the company photo archive

Eyl / setting out

Setting Out Guide in Eyl

Setting out marks the building position on the ground from the drawings, before the foundations are dug. This guide explains the step. Hill Development sets out from the surveyed plot.

Design. Build. Deliver.Eyl

02 / Your location

setting out in Eyl.

Eyl is a coastal town on the Indian Ocean. For construction, the coastal salt and humidity point to corrosion-resistant finishes and good ventilation, with supply by road.

In Eyl, planning setting out means the coastal salt and humidity point to corrosion-resistant finishes and good ventilation, with supply by road. Hill Development reviews the site, prepares the drawings and confirms the scope and the exact figure with a quotation before work begins.

Project locationEyl

Share the plot location and project scope with our Hargeisa office to discuss availability and site arrangements.

Discuss your location ↗
01

Design and build

From architectural drawings to completion, with our own engineers and site teams.

02

A coordinated build

One team from plot to keys.

03

Building from abroad

Progress reports and pictures keep you informed while our team manages the work on site.

03 / From brief to handover

A straightforward path to your build.

Design, construction and handover with a coordinated team.

  1. 01

    Brief

    Send your plot location and what you want to build.

  2. 02

    Design

    Prepare the drawings and agree the scope.

  3. 03

    Build

    Our own teams carry out the work.

  4. 04

    Hand over

    Inspect the finished building and hand over the keys.

Concrete pouring from the company construction archive

Drawings guide the work.
Our teams bring it to site.

04 / Your questions

Before we begin.

What is setting out in Eyl?

Marking the building position and levels on the ground from the drawings, before excavation.

What should I consider when building in Eyl?

Eyl is a coastal town on the Indian Ocean. The coastal salt and humidity point to corrosion-resistant finishes and good ventilation, with supply by road.

Why set out accurately?

A building set out wrong is wrong from the start, so the marks are checked before digging.

Start a conversation

Tell us what you want to build.

Share your project in Eyl with the team.

Message on WhatsApp ↗info@hilldevelopment.io+252 63 4428686