Skip to content
MTR 1 completed house in the company photo archive

Hargeisa / mixed-use building construction

Mixed-Use Building Construction in Hargeisa

A mixed-use building holds shops or offices on the ground floor and homes above, sharing the structure but separating the uses. The entrances, services and circulation keep the uses apart. As a Somaliland benchmark, commercial construction is typically around $300 to $400 per square metre, construction-only and excluding land.

Design. Build. Deliver.Hargeisa

02 / Your location

mixed-use building construction in Hargeisa.

Hargeisa is a highland capital with a mild, dry climate and cooler nights than the coast. For construction, the milder highland air means less salt exposure than the coast, so standard finishes and frames last well, while the cooler nights make good roof insulation worth the cost.

In Hargeisa, planning mixed-use building construction means the milder highland air means less salt exposure than the coast, so standard finishes and frames last well, while the cooler nights make good roof insulation worth the cost. Hill Development reviews the site, prepares the drawings and confirms the scope and the exact figure with a quotation before work begins.

Project locationHargeisa

Visit our office at 204 British School St, Jigjigayar Area, Hargeisa.

Discuss your location ↗
01

Design and build

From architectural drawings to completion, with our own engineers and site teams.

02

A coordinated build

One team from plot to keys.

03

Building from abroad

Progress reports and pictures keep you informed while our team manages the work on site.

03 / From brief to handover

A straightforward path to your build.

Design, construction and handover with a coordinated team.

  1. 01

    Brief

    Send your plot location and what you want to build.

  2. 02

    Design

    Prepare the drawings and agree the scope.

  3. 03

    Build

    Our own teams carry out the work.

  4. 04

    Hand over

    Inspect the finished building and hand over the keys.

Concrete pouring from the company construction archive

Drawings guide the work.
Our teams bring it to site.

04 / Your questions

Before we begin.

What matters in a mixed-use building in Hargeisa?

Separating the shops or offices from the homes above, with separate entrances, services and circulation.

What should I consider when building in Hargeisa?

Hargeisa is a highland capital with a mild, dry climate and cooler nights than the coast. The milder highland air means less salt exposure than the coast, so standard finishes and frames last well, while the cooler nights make good roof insulation worth the cost.

How is a mixed-use building costed?

By the floor area and the mix of uses, confirmed with a project-specific quotation.

Start a conversation

Tell us what you want to build.

Share your project in Hargeisa with the team.

Message on WhatsApp ↗info@hilldevelopment.io+252 63 4428686