Finishing covers the floors, walls, kitchens, bathrooms and paint that make a house ready to live in. This guide explains the finishing stages and how they are sequenced. Hill Development finishes the house to the agreed specification.
01 / Selected views
Explore the completed house from the entrance to the full compound.
02 / Your location
Kismayo is a hot, humid southern port on the Indian Ocean. For construction, the coastal humidity and salt point to corrosion-resistant hardware, with the port easing the supply of materials.
In Kismayo, planning house finishing means the coastal humidity and salt point to corrosion-resistant hardware, with the port easing the supply of materials. Hill Development reviews the site, prepares the drawings and confirms the scope and the exact figure with a quotation before work begins.
Share the plot location and project scope with our Hargeisa office to discuss availability and site arrangements.
Discuss your location ↗From architectural drawings to completion, with our own engineers and site teams.
One team from plot to keys.
Progress reports and pictures keep you informed while our team manages the work on site.
03 / From brief to handover
Design, construction and handover with a coordinated team.
Send your plot location and what you want to build.
Prepare the drawings and agree the scope.
Our own teams carry out the work.
Inspect the finished building and hand over the keys.

Drawings guide the work.
Our teams bring it to site.
04 / Your questions
Floor coverings, wall finishes, kitchen and bathroom fitting, doors and paint, completed in a sequence so the finished work is not damaged by later trades.
Kismayo is a hot, humid southern port on the Indian Ocean. The coastal humidity and salt point to corrosion-resistant hardware, with the port easing the supply of materials.
Wet trades like plumbing and plastering come first, then floor and wall finishes, then fitting and painting, so each stage is protected.