Design and build
From architectural drawings to completion, with our own engineers and site teams.

Las Anod / floor screeding
Floor screeding lays a level base over the structure, ready for the floor finish. This guide explains the work. Hill Development screeds floors to the levels in the drawings.
01 / Selected views
Explore the completed house from the entrance to the full compound.
02 / Your location
Las Anod is an inland, semi-arid town. For construction, the inland, dry climate is hard on unshaded walls, and materials are moved in by road, so lead times matter.
In Las Anod, planning floor screeding means the inland, dry climate is hard on unshaded walls, and materials are moved in by road, so lead times matter. Hill Development reviews the site, prepares the drawings and confirms the scope and the exact figure with a quotation before work begins.
Share the plot location and project scope with our Hargeisa office to discuss availability and site arrangements.
Discuss your location ↗From architectural drawings to completion, with our own engineers and site teams.
One team from plot to keys.
Progress reports and pictures keep you informed while our team manages the work on site.
03 / From brief to handover
Design, construction and handover with a coordinated team.
Send your plot location and what you want to build.
Prepare the drawings and agree the scope.
Our own teams carry out the work.
Inspect the finished building and hand over the keys.

Drawings guide the work.
Our teams bring it to site.
04 / Your questions
A level base laid over the structure, ready for the finished floor on top.
Las Anod is an inland, semi-arid town. The inland, dry climate is hard on unshaded walls, and materials are moved in by road, so lead times matter.
A level base keeps the finished floor flat and true, and it holds the falls for drainage.
Start a conversation
Share your project in Las Anod with the team.
Message on WhatsApp ↗info@hilldevelopment.io+252 63 4428686